6th ESLS-RF Meeting 2002 PSI Villigen, Switzerland
28th and 29th November 2002
ᅵ
7th ESLS RF Meeting will be organized at ANKA
Coordinator: Francis Perez ᅵ(francis.perez@iss.fzk.de)
PROCEEDINGS ᅵ(pdf format)
1st Session: Future Projects
Chairman: M. Svandrlik| Chairman Summary |
M. Svandrlik |
| Status of the SOLEIL RF system |
P. Marchand |
| Test of the SC SOLEIL cavity prototype at the ESRF |
J. Jacob |
| Diamond RF status |
M. Dykes |
| Diamond booster R F system |
A. Moos |
| Status of the ELETTRA RF system upgrade project |
A. Fabris |
2nd Session: Power Sources
Chairman:W. Anders| Chairman Summary |
W. Anders ᅵ ᅵ ᅵ ᅵ |
| Low cost 200 kW CW 352 MHz MOSFET Amplifier Design |
T. Ruan |
| SOLEIL Booster RF |
J. Pollian |
| Supervision and Power Supply for High power Solid State Amplifier |
F. Riberio |
| Power sourced, what next? Discussion on possible common strategies |
W. Tron |
| related topic: EEV presentation given at Bessy |
|
| related topic: mail exchange on high power combiner (tanks to Christopher) |
C. Gough |
3rd Session: Landau Cavities
Chairman:P. Marchand| Chairman Summary |
P. Marchand ᅵ ᅵ ᅵ |
| SLS-S3HC cryogenic system commissioning |
A. Anghel |
| SLS-S3HC first cold operation ᅵfirst cold operation |
M. Pedrozzi |
| Longitudinal Beam Dynamics with Harmonic RF systems |
V. Serriere |
| ELETTRA S3HC installation and warm operation |
M. Svandrlik |
| Status of BESSY II (Landau Cavities) |
W. Anders |
| HOBICAT a Horizontal Testfacility for Superconducting Cavities at BESSY. |
W. Anders |
7th ESLS RF Meeting will be organized at ANKA
Coordinator: Francis Perez ᅵ(francis.perez@iss.fzk.de)

